Job management

PETRONOC has established a standardized and process-oriented operation management system, covering the entire process from drilling design, equipment allocation, on-site construction to well completion and commissioning. Through digital platforms (such as the DrillOpt system), over 50 parameters including drilling pressure, rotational speed, and pump pressure are monitored in real time. Combined with the AI early warning function, potential risks can be identified 48 hours in advance. We have formulated over 200 SOP documents to standardize operation procedures and adopted a project-based management model to ensure that operations from conventional Wells to high-temperature and high-pressure Wells can be carried out efficiently. The average mechanical drilling rate has increased by 22% and the construction period has been shortened by 15%.